SIEMENS
SINAMICS G180
Option descriptions
Inspection options
4/32
Siemens D 18.1 · 2014
4
■
Options
F71 to F73 and F80 to F85
Inspections for converters
Endurance run test bays up to 270 kW in Siemens Ruhstorf factory
In general, every converter that leaves the factory is subjected
to a routine test under load conditions. The converter is therefore
preparameterized. This assures the high quality standards of
every SINAMICS
G180 converter. Options
F71
to
F73
and
F80
to
F85
also allow further tests to be performed, also with the
customer present.
Options for inspections mutually exclude each other.
Inspections for converters
Option
Routine test under no-load conditions with the customer present
F71
Routine test with 1PS or 1MD motor (ordered with converter in package),
under no-load conditions (without customer present)
F72
Routine test with 1PS or 1MD motor (ordered with converter in package),
under no-load conditions with customer present
F73
Visual inspection and function test under rated load using test bay motor
(without customer present)
F80
Visual inspection and function test under rated load using test bay motor
with customer present
F81
Visual inspection and function test under rated load with 1PS or 1MD motor
(ordered with converter in package) (without customer present)
F82
Visual inspection and function test under rated load with 1PS or 1MD motor
与客户与转换器(命令包)present
F83
Advanced visual inspection and function test under rated load with 1PS or
1MD motor (ordered with converter in package) (without customer present)
F84
Advanced visual inspection and function test under rated load with 1PS or
1MD motor (ordered with converter in package) with customer present
F85
Option description
• Check of the mechanical system and the touch protection
• Check for completeness
• Check of equipment (components)
• Check of cables
• Check of customer documentation
• Check of power supply
• Check of fans
• Check of equipment identifier
• Precharging test
• Function check of the converter control
• Function check of protective and monitoring devices (simulation)
• Function check of the customized control
Measurement of shaft voltage, vibration and audible noises at no load on the motor
Measurement of the output of the converter (efficiency, power factor)
Measurement of the output at the motor (efficiency, power factor)
Harmonic analysis of line and motor current at the test bay motor
Warm-up at the drive's rated operating point
Temperature measurement on the converter
Temperature measurement on the motor
Temperature measurement on LOHER 1PS or 1MD motor
Special tests under full-load conditions:
• Single-phase interruption of the motor infeed
• Single-phase interruption of the converter infeed
• Ground fault at converter output
Special tests in no-load operation:
• Two-phase short-circuit at the motor terminals
Submission of the inspection report
With customer present
© Siemens AG 2014