SIEMENS
SINAMICS G150 NEMA
C型封闭式机箱
3
西门子D11.7.
(Part 1) – 2013
选择描述
3/8
Standard documentation
使用新的SINAMICS G150提供的客户图纸
NEMA始终是作业特定的(显示了配置
actually supplied, options not provided are not shown).
All customer documentation is provided in electronic format
on a CD, which ships inside the drive. All documents are in
pdf format (Adobe Acrobat) and are supplied in English
and a copy in Spanish. In addition, a paper copy of the
安全和运输指南和安装
检查列表也包含在内。
D02
DXF格式的客户图纸
示意图,轮廓尺寸和布局图将
在CD上提供AutoCAD(DXF)(或标本
通过其他选项代码)。
D04
Customer documentation in paper format, one set
A paper copy of customer drawings, spare parts list and test
certificate is shipped with the drive. For multiple copies, add
option code to order no. multiple times (once for each set).
D14
Advance copy of customer documentation (pdf)
收到早先的客户图纸副本
drive shipment, i.e. after order placement (typically within
2周)。如果选项代码D02和/或D04被指定,则
advance copy of the drawings will be supplied in dxf format
and/or paper too.
D58
Documentation English/French
文档的两份副本(图纸和手册)
将在CD上提供(或其他选项的规定
codes), one in English and the other in French.
F03, F71, F75, F77, F97
见证(或观察)测试
订单描述
code
F03
视力检查
The scope of the inspection comprises:
由客户
•检查外壳type
• Checking the equipment (components)
•检查设备标识符
• Checking the clearance and creepage
距离
• Checking the wires
•检查客户文档
• Submitting the acceptance report
检查是用的
驱动Deenergined。
F71
见证
The scope of the witnessed test
function test of
comprises:
开车而没有
• Visual inspection as per option
F03
发动机
• Check of power supply
•检查保护和监控
设备(模拟)
•检查粉丝
• Precharging test
• Functional test without connected
发动机
• Submitting the acceptance report
随着驱动器的目视检查后
关闭,驱动器连接到
rated voltage. No current flows at the
驱动输出。
F75
见证function
The scope of the witnessed test comprises:
用测试湾测试
• Visual inspection as per option F03
电机,无负载
• Check of power supply
•检查保护和监控
设备(模拟)
•检查粉丝
• Precharging test
• Functional test with test bay motor
(空载)
• Submitting the acceptance report
随着驱动器的目视检查后
关闭,驱动器连接到
rated voltage.
驱动输出处的小电流流动
到power the test bay motor (no load).
F77
见证test incl.
接受的范围包括:
high-voltage and
•高压测试
insulation test
• Measurement of insulation resistance
F97
见证customer
如果需要额外的目击测试
规定的驱动器
over and above options
F03
到
F71,
acceptance
please provide a specification/test plan
inspections/tests
为工厂提交报价。
(on request)