SIEMENS
ROBICON Perfect Harmony
Liquid-cooled drives
4/2
Siemens D 16.2
– 2012
4
Options
Description of Options
Below you will find a detailed description of the options
available. To easily find the required order code and its
associated parameters, the descriptions are sorted
alphabetically by order codes in the paragraphs below.
A30, A31
Operator panel, touchscreen
Option
Description
A30
Touchscreen with standard cable
Standard Siemens touchscreen with standard Ethernet
cable will be provided on the door of the drive. Option
A30 includes option
N85
(Operator panel located internal
to cabinet).
A60 to A65
Motor monitoring
Note: The options
A60
to
A65
are mutually exclusive. Select
one of them only.
Option
Description
A60
TEC System RTD monitor
Basic 8-channel RTD monitor
A61
Multilin 369 motor protection relay
Motor protection/management relay with only 12-channel
RTD monitoring capability installed.
This is provided on the output of the drive.
A62
Multilin 369 motor protection relay with metering kit
Motor protection/management relay with 12-channel RTD
monitoring capability installed.
This is provided on the output of the drive.
A63
Multilin 469 motor protection relay
Full featured high-end motor protection / management relay
with miscellaneous sensors monitoring capability installed.
This is provided on the output of the drive.
A64
Siemens 7UM61 motor protection relay
Motor protection/management relay with Siemens 7UM61.
This is provided on the output of the drive.
A65
Siemens 7UM62 motor protection relay
Motor protection/management relay with Siemens 7UM62.
This is provided on the output of the drive.
A66
Sync check relay for synchronizing
With option
A66
, a sync check relay for synchronizing the
input and output voltage and frequency during synchronous
transfer operation is mounted on the right door.
A67, A69
Power quality monitoring
Option
Description
A67
Multilin input power quality meter
Multilin power quality meter installed at the input of
the drive.
A69
Siemens 9510 input power quality meter
Siemens power quality meter installed at the input of
the drive
B43, B45
Production schedules
The options
B43
to
B45
provide production schedule
documents. These are sent via E-Mail as PDF files in
English after order clarification.
Option
Description
B43
Production schedule: One issue
B44
Production schedule: updated at 2-week intervals
B45
Production schedule: updated once per month
Table 3-1 Mutually exclusive options
B43
to
B45
Production Schedules
Code
B43
B44
B45
Production schedule:
One issue
B43
―
―
Production schedule:
updated at 2-week intervals
B44
―
―
Production schedule:
updated once per month.
B45
―
―
―
Options are mutually exclusive